Sheet 03 / Construction & trades
Field compliance software for the people actually on site.
Office software assumes a desk, a keyboard and time. Site software has to work in a stairwell, on a roof, in the rain, in three minutes, on a phone.
- Construction
- Electrical
- Mechanical
- Roofing
- Scaffolding
- Civils
Sheet 03 / A
Who this is designed for.
Built Still is designed for construction and trade businesses requiring structured field compliance records. The sectors below describe the working patterns the product is built around.
Nothing on this page describes an existing customer, deployment or project. These are the kinds of business the product is designed to suit, and the record-keeping pressures that come with each way of working.
No sector-specific regulatory claim is made anywhere on this site. Whatever applies to your work continues to apply regardless of how the record is captured.
Sheet 03 / B
Sector register.
- 01
General Construction
How the work runs
Multiple work packages running at once, with subcontractors arriving, working and leaving inside the same week.
What the record needs
Consistent issue and acknowledgement across packages, so the record does not depend on which supervisor happened to be on site.
Construction and trades context
- 02
Electrical
How the work runs
Work packages that are planned in detail and then executed across several floors or several buildings.
What the record needs
Method statement acknowledgement recorded against the people on the package, with checks captured as they are completed.
Electrical trade context
- 03
Plumbing & Mechanical
How the work runs
Mechanical services teams moving between plant rooms, risers and occupied areas over long programmes.
What the record needs
Repeat checks and photographic evidence captured at the point of work rather than written up at the end of a shift.
Mechanical trade context
- 04
Roofing
How the work runs
Short, intense periods of work at height where the paperwork is the last thing anyone wants to handle on a roof.
What the record needs
Fast structured entry on a phone, with photographs attached to the specific item they relate to.
Roofing trade context
- 05
Scaffolding
How the work runs
Structures that change through their life and are checked repeatedly by different people.
What the record needs
Repeat check records with photographic evidence and a clear acknowledgement trail across visits.
Scaffolding trade context
- 06
Fit-Out
How the work runs
Fast-moving internal packages where the programme moves quicker than the paperwork ever does.
What the record needs
Records captured in the moment, so the administration does not accumulate into a backlog.
Fit-out context
- 07
Maintenance
How the work runs
Short visits, often single-operative, across many different properties in a week.
What the record needs
A consistent, retrievable record per visit rather than a job sheet that varies by operative.
- 08
Property Services
How the work runs
Distributed operatives working across a portfolio of addresses and property types.
What the record needs
The same structure applied across every address, so records can be found without knowing who attended.
- 09
Civil Works
How the work runs
Groundworks and infrastructure with long programmes, changing conditions and multiple parties.
What the record needs
Structured checks and evidence captured on site, retained in a form that survives staff changes.
Civil works context
- 10
Specialist Trades
How the work runs
Specialist packages with their own methods, their own checks and their own acknowledgement needs.
What the record needs
Checklists and records shaped around the specialist activity rather than forced into a generic template.
Sheet 03 / C
The same structure across every trade.
Built Still is designed for construction and trade businesses requiring structured field compliance records.
- 01
General Construction
Principal contractor and subcontractor field records across multiple work packages.
- 02
Electrical
Method statement acknowledgement and structured checks for electrical work packages.
- 03
Plumbing & Mechanical
Mechanical services teams recording checks, evidence and sign-off in the field.
- 04
Roofing
Working-at-height documentation captured against the task rather than after it.
- 05
Scaffolding
Repeat check records, photographic evidence and acknowledgement trails.
- 06
Fit-Out
Fast-moving internal packages where paperwork usually lags behind the work.
- 07
Maintenance
Short-duration visits that still need a consistent, retrievable record.
- 08
Property Services
Distributed operatives working across many addresses and property types.
- 09
Civil Works
Groundworks and infrastructure teams capturing structured checks on site.
- 10
Specialist Trades
Specialist packages needing their own checklists, evidence and acknowledgement.
Sheet 03 / D
Scope and responsibility.
Built Still is designed to support construction and trade businesses with site compliance administration and record keeping. It does not carry sector accreditations, does not assess whether your business meets any particular scheme's requirements, and does not replace the judgement of the people responsible for the work.
Next step
Which of these looks like your business?
Tell us what your teams do, how many sites or addresses they cover, and where the compliance record currently becomes fragmented.

